Case studyWater Systems May 20, 2024 1 min read
Aquifer Storage and Recovery for Demand Levelling — Riyadh
## Background
Riyadh's treated water demand peaks sharply in June–August, requiring desalination plants to run at or above nameplate capacity. The National Water Company sought a buffer that could absorb off-peak production and release it during peak periods.
## Challenge
The local aquifer is brackish (TDS 1,800–2,400 mg/L) and heterogeneous. Injected treated water must be recovered with quality ≥ potable standards without excessive blending.
## Approach
A three-well ASR pilot was constructed with a 500 m³/h injection capacity. Recovery was managed through a blending ratio model that ensured TDS at the wellhead stayed below 500 mg/L. Cycle testing over two years refined the injection-storage-recovery sequence.
## Results
- 4.2 million m³ stored and recovered in Year 2 pilot
- Peak-day desalination plant load reduced by 12 %
- Recovered water TDS consistently below 480 mg/L
- Unit cost of stored water: USD 0.09/m³ vs. USD 0.31/m³ for incremental SWRO capacity
The challenge
Buffer treated water supply against sharp summer peak demand without building additional desalination capacity.
The solution
Three-well ASR system with 500 m³/h injection, real-time TDS monitoring at wellheads, and a hydraulic model governing the recovery blend ratio.
The results
4.2 Mm³ stored and recovered; peak desalination load −12 %; recovered TDS < 480 mg/L; stored water cost 70 % below incremental SWRO.
Keys to success
Blending ratio model keeping recovered TDS < 500 mg/L; two-year cycle testing to optimise injection-recovery sequence; multi-well redundancy.